Quantity Price Breaks for Cut Parts
October 9, 2026 · Updated November 9, 2026
"How much for 10? And for 100?" Almost every RFQ for cut parts asks about more than one quantity. Your answer has to do two things. It has to show that bigger orders really are cheaper per part, which they are. And it must not give away margin you never needed to give.
This post covers how to build quantity breaks that do both. It assumes you already have a per-part cost and a setup fee. If not, start with how to price laser cutting and minimum charges and setup fees.
Where volume savings actually come from
Before choosing a discount, be clear about why bigger orders cost you less per part. In a cutting shop, the savings come from:
- Setup spread over more parts. File checks, programming, loading and the first-part check happen once per order. This is usually the biggest effect.
- Better material use. More copies of a part fill a sheet better, so less of the skeleton is wasted per part.
- Fewer interruptions. One long run has fewer stops and restarts than several short ones.
- Handling and admin. One invoice and one shipment instead of many.
Cut time per part doesn't fall much with quantity. The machine still has to trace every contour and make every pierce. So a discount that cuts machine time by 30% at 100 parts is a discount you're paying for yourself.
Two ways to price quantity
Option 1: Let the setup fee do the work
If your formula already includes a setup fee, quantity pricing happens on its own:
order price = (setup fee + qty × part cost) × (1 + margin)
per-part price = order price / qtyAs quantity grows, the setup fee per part shrinks towards zero, and the per-part price approaches part cost × (1 + margin). That's honest, easy to explain, and needs no tier table. For many small shops it's enough.
Option 2: Add explicit break tiers
Explicit tiers make sense when material use clearly improves at volume, or when you want round, easy-to-read prices. A tier table applies a multiplier to the part cost (not to the setup fee) at quantity thresholds:
- 1–9: × 1.00
- 10–49: × 0.95
- 50–199: × 0.90
- 200+: × 0.85
These multipliers are an illustration, not a recommendation. Base yours on what actually gets cheaper in your shop: mostly material use and handling, as above.
Worked example
Hypothetical inputs, not benchmarks (use your own values):
- Material per part: $2.00 at 1–9 parts. At 50+ parts, better nesting saves 10% of material, so $1.80.
- Machine time per part: $3.00 (unchanged by quantity)
- Setup fee: $40
- Margin: 25%
Option 1 (setup fee only, no tier):
- 1 part: ($40 + $5.00) × 1.25 = $56.25, so $56.25 per part
- 10 parts: ($40 + $50) × 1.25 = $112.50, so $11.25 per part
- 100 parts: ($40 + $500) × 1.25 = $675.00, so $6.75 per part
Option 2 (tier based on the real material saving at 50+):
- 100 parts: material $1.80 + machine $3.00 = $4.80, so ($40 + $480) × 1.25 = $650.00, or $6.50 per part
The tier passes on a real saving of $0.25 per part. If you'd applied a blanket "15% off at 100" to the whole order instead, the price would be $573.75, or $5.74 per part. That gives away about $76 of margin you didn't need to give, on a single order.
Choosing break points
Good break points sit where your costs actually step down:
- Where a sheet fills up. If 24 parts fit on one sheet, breaks at 24 and 48 reflect real savings better than breaks at 25 and 50.
- At common order sizes. Look at your last few dozen quotes. If customers often ask for 10, 25 and 100, set your breaks there so the quote answers their actual question.
- Not too many. Three or four tiers is plenty. Too many tiers make customers wonder whether they should order one more part.
Showing breaks on the quote
The most useful thing a quote can do is answer the next question before it's asked:
- Show the per-part price at the customer's quantity and at the next one or two break points.
- Show the total for each, not just the per-part price.
- If a break point is close, say so: "Order 24 for $6.90 each instead of 20 at $7.40 each."
This often leads to slightly bigger orders. That's good for you, because the extra parts come from a sheet you were already cutting.
Repeat and blanket orders
Repeat orders bring their own savings: the program exists, the file is checked and the customer is known. Reflect that with a reduced repeat setup rather than a deeper quantity discount. Customers see the reward for coming back, and your per-part margin stays intact.
For blanket orders, where the customer commits to 500 parts over a year and takes delivery in batches of 50, price each batch with its own setup. Then decide whether the commitment is worth a small tier step. Write down what happens if they don't take the full quantity.
Common mistakes
- Copying another shop's discount table. Their material costs, sheet sizes and setups aren't yours.
- Discounting machine time. It barely changes with quantity.
- Forgetting the minimum. Make sure the smallest tier still respects your minimum charge.
- Breaks that drop below cost. Check the per-part price at your largest tier against part cost plus a margin you can live with.
Our list of common laser shop pricing mistakes covers a few more of these. Kerfrate's planned price book is designed to hold your setup fee, minimum and break tiers, and to show buyers the next break point on your own website. Join early access to try it when it opens.