The machine hourly rate turns seconds of cutting into dollars on a quote. Get it too low and every job you win quietly loses money. Get it too high and you lose the jobs you should win. Few shops can say where their number came from. It was copied from a competitor’s price, inherited from a previous owner, or set once and never revisited. This guide shows how to build yours from your own costs, and how to check it against work you’ve already done.

Cost rate first, selling rate second

Keep two numbers apart. The cost rate is what one hour of cutting actually costs you. The selling rate is the cost rate plus your margin. If you put margin inside the hourly rate, you can no longer tell whether a cheap quote was a deliberate discount or a costing mistake. In the pricing formula, margin is applied once, at the end.

The three buckets

1. Fixed costs per year

Costs you pay whether the machine cuts or not:

  • Machine finance, lease payments or depreciation
  • Service contract and planned maintenance
  • The machine’s share of rent, insurance, software licenses and office overhead
  • Compressor, chiller and fume extraction ownership costs

2. Variable costs per cutting hour

Costs that rise with every hour the beam is on:

  • Electricity for the source, chiller and extraction
  • Assist gas (nitrogen, oxygen or compressed air, depending on the job)
  • Consumables such as nozzles, protective windows and lenses

Take these from your own bills and logs. Divide a month’s gas bill by the cutting hours logged that month, and do the same for power where you can separate it out. Published figures for other machines won’t match yours.

3. Labor

The operator’s fully loaded cost (wages plus taxes and benefits) for the hours they’re attached to the machine, including loading, unloading and sorting parts, not only beam-on time.

Productive hours: the number that matters most

Fixed costs and labor are spread over the hours the machine is actually cutting billable work, not the hours the shop is open. Changeovers, sheet handling, maintenance, test cuts and idle time all come out. A machine that is staffed for a full shift but cuts for only part of it has a much higher true cost per cutting hour than the shift length suggests. If your controller or nesting software logs beam-on time, use a few months of that log rather than an estimate.

A worked example

Hypothetical inputs, not benchmarks. Replace every number with your own.

  • Fixed costs: $48,000 machine finance + $6,000 service + $18,000 share of overhead = $72,000 a year.
  • Paid shift hours: 2,000 a year. Share of those spent cutting billable work: 60% → 1,200 productive hours.
  • Fixed cost per productive hour: $72,000 ÷ 1,200 = $60.
  • Variable costs per cutting hour from bills: power $8 + gas $12 + consumables $3 = $23.
  • Operator: $30/hour fully loaded × 2,000 hours = $60,000 ÷ 1,200 productive hours = $50.
  • Cost rate: $60 + $23 + $50 = $133 per cutting hour.

Notice what happens if cutting time rises from 60% to 75% of the shift (1,500 hours). Fixed cost per hour drops to $48 and labor to $40. The cost rate falls to $111 without any change in spending. Utilization is the strongest lever on your rate, so measure it rather than assume it.

Separate rates for separate gases or machines

If you cut stainless with nitrogen and mild steel with oxygen, the variable part of the rate differs, and a single blended rate will overprice one and underprice the other. The same applies if you run two machines of different power or age. Two or three rates, each one honest, beat one average.

Test the rate against jobs you’ve won

  1. Pick three to five recent jobs whose price you know the customer accepted.
  2. Recalculate each one with the new rate and the rest of your current inputs.
  3. Compare. If the new prices are far above what customers accepted, check your productive-hours figure before cutting the rate.
  4. If they come out far below, you have been undercharging. Raise the rate on new quotes first, and review repeat customers’ prices at their next order.

Revisit the rate whenever a big input changes, such as new finance terms, a gas contract or a second shift. Plasma and waterjet machines follow the same method with different variable costs. See plasma vs laser vs waterjet.